pieman33333 pieman33333
  • 04-04-2018
  • Mathematics
contestada

Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

Charles is an engineer who is evaluating a prototype of an artificial heart. The prototype beats in a synchronized fashion, is hollow, and has tubes attached to
What does not contribute to wellness
Vieques es un municipio de ____. la república dominicana puerto rico entre los atractivos de la isla se encuentra ____. un pico altísimo una bahía bioluminiscen
Find the area of the figure.(Sides meet at right angles)
I need help on this question
what color calms anxiety best
Enumerate the changes that takes place in liquid during Evaporation ?
When traveling downhill it takes longer to stop and more blank to change direction?
Find the sample standard deviation with the data 0.62, 1.05, 0.58, 1.17, 1.04, 1.37, 1.32, 0.67, 1.25 1.38, 0.86
How do I solve this?