Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

What is 5.6 divided by 4.48
Is 2/15 a repeating decimal or a terminating decimal?
How do you round 1945 to the nearest hundred
What region of the United States is the Dust Bowl associated with?
add or subtract mentally 8.01+1.09
Which practice was common among modernist poets?
lisa is painting a fence that is 26 feet long and 7 feet tall. A gallon of paint will cover 350 square feet. Write and slove a proportion to determine how many
In 1803, the United States purchased the Louisiana Territory from? A. Britian B. France C. Florida D. Spain
Simplify. 10 – 5.3 • (–4 + –6) a. 63 b. 47 c. –43 d. –47
is ammonia a homogeneous mixture?