fandox
fandox fandox
  • 02-06-2017
  • Mathematics
contestada

If it takes 4 men 6 hours to repair a road, How long will it take 3 men to do the job if they work at the same rate ? A) 5 hours B) 6 hours C) 8 hours D) 9 hours

Respuesta :

Аноним Аноним
  • 02-06-2017
answer is C) 8 hours

hope it helps
Answer Link
shanobaigwa
shanobaigwa shanobaigwa
  • 07-08-2021

Answer:

step 1 : 4men = 6 hrs

3 men =  ?

step 2 : 4 times 6 = 24

step 3 : 24 divided by 3 = 8

ANSWER: 8 hours (c)

Answer Link

Otras preguntas

suggest three reasons why government should invest in sports​
Which Lewis dot diagram above correctly represents a nitrogen atom?
who was the first permanent English settlement in North America. It was founded in 1607.
4. Which of the following types of functions is not considered a polynomial? f. A cubic g. A logarithmic h. A quadratic i. A linear
Question 1/10 NEX OOKMARK Previous 1 Sameen bought 2 and 1/5 pounds of carrots for $6.60. At that rate, how much would 1 pound of carrots cost?
and a friend buy two fruit smoothies and leave a tip. You split thethe value of x? 20total and your half comes to $3.60. What percent tip (in decimal form)did y
Write an inequality that compares -6 and 3
I need help with this physics question
Which of the following was the first college founded in the colonies?
Express 9.54 as a mixed number