khloesmith14 khloesmith14
  • 03-03-2022
  • Mathematics
contestada

A group of workers can plant 81 acres in 9 days. What is their rate in acres per day?

Respuesta :

lilswooosh082110 lilswooosh082110
  • 03-03-2022

Answer: 9 acres.

Step-by-step explanation:

9 times 9 in 81 easy math. hope this helps :)

Answer Link

Otras preguntas

there are four marbels in a bag with the colors red white blue and green john pulls out one marbel and rosses a coin how many elements are there in the sanple s
In a container there were 5 L of a gas at 25 °C. If the temperature decreases to -10 °C, what will be the new volume of the gas?
a common characteristic of a fad diet is that it claims to what
What was important about Washington's farewell speech?
Compare using <, >, or =. 1/2 ___ 5/10 < > =
For two functions, m(x) and p(x), a statement is made that m(x) = p(x) at x = 7. What is definitely true about x = 7? (2 points)
Which statement accurately describes the U.S. government's handling of Japanese Americans during World War II? A. The government made sure that Japanese Americ
what is computer mouse?
Which corrects the shift in tense in this sentence? They all like the beach, but none of them swimming in the ocean. A. swum B. swim C. had swimming D.
A radio signal travels at 3.00 • 10^8 meters per second. How many seconds will it take for a radio signal to travel from a satellite to the surface of Earth if