The top-down method of estimating project time and costs that is useful for projects requiring the same task, group of tasks, or product repeated several times, especially if it is labor intensive, is the ______________.
a) function point
b) ratio
c) apportion
d) consensus
e) learning curves

Respuesta :

parisannthornton parisannthornton
  • 04-08-2021
The answer is e) learning curves
Answer Link

Otras preguntas

What fractions are equivalent to 11/22
8g-14g+22=37 what does g equal
PLEASE HELP! Which types of molecules are used both for energy storage and as structural material? Choose all answers that are correct. A. lipids B. prote
How did The Renaissance pave the way for the Scientific Revolution
Si la hija de Maria es la Madre de mi hija entonces Que soy yo de Maria
What was the reason for the Sugar Act of 1764? To keep the colonists safe To pay for war debts To prevent smuggling To raise funds for the colonies
70% of what number is 50
Verify (2cos2x)/(sin2x) =cotx - tanx
Simplify the radical expression by rationalizing the denominator. 4 divided by the square root of 21.
What is the conjugation for nous and vous for futur simple?