maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

which is understanding of classification an important skill
When a sample of a gas is heated in a sealed, rigid container from 200. K to 400. K, the pressure exerted by the gas is (1) decreased by a factor of 2. (2) incr
Given the balanced equation representing a reaction: O2 --> O + O What occurs during this reaction? (1) Energy is absorbed as bonds are brok
Can someone help me match these up? i know the given is number one I need help with the rest.1.line RS || segment AB, ∠1=∠22.∠B = ∠13.∠A = ∠24.∠A = ∠B5.RA = RBA
the sum of two integers is -1. the product of the integers is -72 find the integers.
Which two earth layers are separated by the moho boundary?
What is the supreme law of the land?
Which class of organic compounds contains nitrogen? (I) aldehyde (2) alcohol (3) amine (4) ether
Which compound is an electrolyte? (I) CH3CHO (3) CH3COOH (2) CH3OCH3 (4) CH3CH2CH3
Which clement is a liquid at STP? (1) bromine (3) francium (2) cesium (4) iodine