What technique is used when setup times at a workstation are sequence dependent?

Respuesta :

littleliax0618
littleliax0618 littleliax0618
  • 04-01-2021

Answer:

johnsons rule minimizes total idle time for both machines or work centers. What technique is used when setup times at a workstation are sequence dependent? determine the total time of each job sequence permutation considering the setup time and choose the best (lowest) time.

Explanation:

please mark me as brainliest thank you

Answer Link

Otras preguntas

Which expression is equivalent to 27/125
What was the major purpose of the Truman Doctrine?
What is the answer to 12-2x6+2/2
example of onomatopoeia in the seven ages of man
How would you call in other words to scold or punish severely
How many moles of water (H2O) would be produced if 10 moles of O2 gas reacted completely with excess H2 gas?2 H2(g) + O2(g) → 2 H2O(g)A. 5 B. 10 C. 20 D. 30
A tree casts a shadow 27 m long. At the same time, the shadow cast by a 66-cm tall statue is 56 cm long. Find the height of the tree to the nearest tenth of a
a subway train starts from rest at a station and accelerates uniformly at 1.8m/s^2 for 15 sec. then it runs at a constant speed for the next 35 sec. before dece
Which expression is equivalent to 27/125
explain why the motion of a body which is moving with constant speed in a circular path is said to be accelerated ?