men can do a work in 32 days in how many days will 24 men complete the same work​

Respuesta :

Аноним Аноним
  • 02-12-2020

Answer:

It will take 32/24, or 1 1/3 days, for 24 men to get the job done.

Step-by-step explanation:

Answer Link

Otras preguntas

Janet is working on an informative essay about Lyme Disease. At this point, she already has all the information she needs and is arranging her information into
Find the area of the figure. (Sides meet at right angles.) 7 yd Vyd 3 yd Byd 4 yd
This Egyptian Kingdom featured very large, idealized sculptures of pharaohs. Old Kingdom New Kingdom Middle Kingdom
Which statement best explains why sugar water can be easily separated? The parts are not chemically bonded together. The parts have simple physical properties.
1. How would you describe a wave to someone who has never seen one before?
Tell whether the triangle with the given side lengths is a right triangle.
SOMEONE PLEASE HELP ANSWER CORRECTLY !!!!!! WILL MARK BRIANLIEST !!!!
This is 5th grade math pls help
find the slope of the line (-9, 1) (1, 9)​
(GIVING BRAINLIEST!!!) We boarded a flight from Orlando, Florida to Buenos Aires in Argentina. We would board a ship that would take us from Argentina to the re