kadenceclay26
kadenceclay26 kadenceclay26
  • 03-10-2016
  • Mathematics
contestada

a contractor's crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

charstar
charstar charstar
  • 03-10-2016
54/3=18

hope this helps :)
Answer Link

Otras preguntas

A boy can swim 75 feet in 12 seconds. What is his rate to the nearest mile per hour?
If y^8= 4 and y^7=3/x, what is the value of y in terms of x?
How do enzymes help to carry out biochemical reactions? A. By decreasing the energy of the reactants B. By increasing the activation energy of the reaction C. B
Which technological development enabled European navigators to determine their location during the Age of Exploration? (1) lateen sail (2) astrolabe (3) cross
How can i solve this f:d->R f(x)=x at power2/x-1
Most autotrophs make “food” through the process of a. photosynthesis. b. homeostasis c. chemosynthesis d. cellular respiration
If a circle is cut from a square piece of plywood, how much plywood would be left over? Use 3.14 for pi
the rectangles on a quilt are 2in. wide and 3in. long the perimeter of each rectangle is made by pattern of ref thread. if there are 30 rectangles in the quilt,
given: quadrilateral ABCD with ∠A= ∠C and BD the bisector ∠ABC prove: DB bisects ∠ADC
How do enzymes help to carry out biochemical reactions? A. By decreasing the energy of the reactants B. By increasing the activation energy of the reaction C. B