lukcyakond13
lukcyakond13 lukcyakond13
  • 03-11-2020
  • Mathematics
contestada

evaluate 60.81 - (-57.6)​

Respuesta :

jwyvac5jdt
jwyvac5jdt jwyvac5jdt
  • 03-11-2020
118.41 that is the answer
Answer Link

Otras preguntas

Worker A can a task in 9 hours while worker B can complete the same task in 4 hours. How long (in hr) would it take the workers to complete the task together? (
I need help with questions 9-12
helppppppppp pelaseeeeeeeeeerre
plz help asap thank youuu
The piece by. was created using. ?1. Pablo Picasso, pastel 2. Vincent van Gogh, chalk 3. Edouard Manet, pastel4. Edgar Degas, chalk ​
Find the sum of the measures of the interior angles of each of the following convex polygons: a pentagon, an octagon, a dodecagon, a 40-gon, a 52-gon, a 100-gon
Find the lateral area of the pyramid to the nearest whole number.
HELP ASAP 50 POINTS What is the equation of the given line in the point-slope form? The coordinates are (0,1) and (3,4). A. y=-x+1 B. y+x=1 C.y+x+1=0 D.4y=3x
Which river is considered the most impotant river
how is the quote “injustice anywhere is a threat to justice everywhere” valid today?