raazshah661 raazshah661
  • 03-09-2020
  • Mathematics
contestada

A can do a piece of work in 20 days and B can do it in 12 days,B work for 9 days,in how many days A alone can do the work​

Respuesta :

roseheart889 roseheart889
  • 03-09-2020

Answer: 9

Step-by-step explanation:

Answer Link

Otras preguntas

Which country had the biggest influence on the history of the Indian subcontinent? A. The United States B. Germany C. Great Britain D. China
(1 point) The revenue, in dollars, from selling x items is R(x)=400x−x2, and the total cost, in dollars, is C(x)=50+9x. Write a function that gives the total pr
5.19 Identify the force present and explain whether work is being performed in the following cases: (a) You lift a pencil off the top of a desk. (b) A spring is
7) length = 20 in; height = 9 in ; width = 7 in
Describe: Imagine a rock on a beach and a rock on the side of a mountain. How would the factors that control weathering be different for these two rocks?
How many universities were founded in England before 1400
What do you think the term “cold war” means?
How many solutions does this system have? 2x+8y=16,-3x+6y=30
Bill and Amy want to ride their bikes from their neighborhood to school which is 14.4 kilometers away. It takes Amy 40 minutes to arrive at school. Bill arrives
at ivans ice cream shop, 8 small sundays costs the same as ordering 4 small small sundays and 2 large sundays. if one small costs $3, how much does one large su