nepalkichori12 nepalkichori12
  • 03-07-2020
  • Mathematics
contestada

5. A worker can do a piece of
piece of wook
in 14 days.
How much coook does he do ini day!
. How much work does he do in 7 days?
lijIt he works for 2 days and leaves,
how much work is left to finish it?

Respuesta :

Sueraiuka
Sueraiuka Sueraiuka
  • 03-07-2020

Answer:

therefore the left work of worker will be 6/7 part of work

Ver imagen Sueraiuka
Answer Link

Otras preguntas

is the established of a national bank constitutional why or why not
Whats the overall goal of good time management
Which of the following was a goal of the Albany movement?
3. Find the area of the triangle. A =_ O O 9 in² in2 13 금 1 O 4½ in 3 38 in 23 2 in
What structure prevents food from entering the nasal cavity while swallowing?
3v / 3vs using positive exponents
Which of the following was an EFFECT of Harriet head injury.
What is the value of n in this equation? -3n = -27
Jenny measured 1/4 cup of flour and 4/9 cup of flower how many cups did jenny measure give answer in reduced terms
3.2 discuss two advantage of obtaining the bachelor’s pass as national certificate