Mpope2986 Mpope2986
  • 03-02-2020
  • Computers and Technology
contestada

In the ____________________ approach, the project is initiated by upper-level managers who issue policy, procedures and processes, dictate the goals and expected outcomes, and determine accountability for each required action.

Respuesta :

tledet24
tledet24 tledet24
  • 03-02-2020

Answer:

top-Down

Explanation:

Answer Link

Otras preguntas

what effect did the breakup of the Soviet Union have on Cubans?
Amanda reads 15 pages of her 150 page book in 2 hours at this rate how long will it take her to read the entire book
What is the exact volume of a cylinder that has a height of 1.8 ft and a radius of 6.1 ft? ft3
Which substance is an electrolyte? (1) CH3OH (3) H2O (2) C6H12O6 (4) KOH
Which pH change represents a hundredfold increase in the concentration of H3O+? (1) pH 5 to pH 7 (3) pH 3 to pH 1(2) pH 13 to pH 14 (4) pH 4 to pH 3
The light emitted from a flame is produced when electrons in an excited state (1) absorb energy as they move to lower energy states (2) absorb energy as they mo
How is a franchise “an almost independent” business?
−4x + y = 6 −5x − y = 21
what was an outgrowth of mass production techniques used during the 1920s?
a car travels 100 meters in 4.0 seconds. Find the average velocity