lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

Help plz I think it’s 1 but does E count?
Take a factor out of the square root: 48x^2 , where x≤0
What is the most precise name for a quadrilateral with the following vertices: A(2,3) B(7,2) C(6,-1) D(1,0) A) Quadrilateral B) Parallelogram C) Rhombus D) R
an integer between 4.5 and 5.5
Differences between frederick Douglass and william Lloyd Garrison??
Who presides over the lower legislative house?Speaker of the HousePresidentLieutenant governorSecretary of State
Why does the Moon orbit Earth instead of the Sun? Group of answer choices Gravity depends on distance and the Moon is closer to Earth. Only large objects orbit
the midsegment of a trapezoid is always parallel to each base true or false
Find the distance between the points (-20, 13) and (4, 13). units
Juan is creating a model of aerobic cellular respiration. Which of the following should he identify as products of the process?