Chan592 Chan592
  • 03-02-2019
  • Physics
contestada

Determine the amount of work done when a crane lifts a 100-N block form 2m above the ground to 6m above the ground

Respuesta :

hrzlatevski
hrzlatevski hrzlatevski
  • 03-02-2019

Data given:

F=100N

Δx=6m-2m=4m

A=?

Formula needed:

A=F×s

Solution:

A=100N×4m

A=400J

Answer Link

Otras preguntas

Maya bought a sweater with a discount of 25%.she saved $18. what ws the sale `price of the sweater
describe what the point 0,0 on the graph represents in terms of the situation being described by the graph
What do words of Martin Luther King mean? "A riot is the language of the unheard."
Select all of the equations that have the same solution as the equation -9(x-18)=108A. 2x+12=24B. -7×20=118C. 17+ 1/2x =10D. -3+4x=-59E. -3- 1/3x = -5
How old are mayan ruins?
1. part A how is Conversational Ballgames excerpt of expository essay organized A.cause and effect B.compare and contrast C.problem and solution D.chronologi
Because I want to manicure has a negative and it displays
which geographic term best describes the region of Arabia? A.peninsula B.island C.continent D. tundra
What is 76 divided by 5
Katrina is building a deck. She cuts 3 lengths of wood from a 72-inch board. The first length is 30 3/4 inches. The second length is 12 1/4 inches. And the thir